cancel
Showing results for 
Search instead for 
Did you mean: 

Inspection Points for Inprocess Inspection

Former Member
0 Kudos

Hi all,

My client is doing In process Inspection during Production process.

They are inspecting based on the Inspection Points (Shift wise).

If I add Inspection point referrence at Header level in routing, after adding the MICs in the required operation, while saving it gives an error message stating that "Maintain Inspection Point referrence at Operation level".

Task List contains error. You want to save or cancel.

How can I achieve this with out error.

Thnx in advance

Sam

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi Sam,

Go to Routing and select the operation, and double click the operation. Then system will popup the new screen here under Quality management Inspection point tab choose No relation. and save the routing.

Check and give the feed back.

Regards,

S.Babusingh

Former Member
0 Kudos

Thnx a lot to all.

Regards

Sam

Answers (1)

Answers (1)

Former Member
0 Kudos

Hi Sam,

In the routing operation overview screen u have to assign any one of the following.

*time related,qty related,no relation.

you have to assign the frequency of RR.

Regards,

Selva.