on 10-14-2008 4:39 AM
Hi experts!
I want to change my client from Repetitve Man to Production Order. Please help me to list all steps need to do . And relative with CO, MM ...
Thanks and Regards
Hi Tony,
To convert from REM to Discrete (Production Order) -
First removal of the REM profile tick on the MRP4 view.
But for this prerequisite is deletion of Production Version.
Following are the prerequisites for deletion of production version.
1) You must settle the product cost collector, created for the version.
2) No more planned orders should exist in the system which are assigned to the production version.
3) If you work with reporting points, then no WIP should exist.
4) If inspection lot exists, the usage decision should be made on the same.
5) There could be some steps in Controlling area to be carried out.
Hope it is clear.
Srini
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Thanks all.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Thanks for your relies!
I also want to know what config notes need to change also.
Waiting your helps.
Regards,
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear,
Master Data for Discrete scenario is the Material master, BOM, Work centers, Routing & if required
Production versions also.
For configuration please refer my reply in this thread,
Please refer this link,
http://www.easymarketplace.de/online-pdfs.php
Please come back if any issue.
Regards,
R.Brahmankar
Tony,
All REM Configs can remain same. You need to configure the following for PP,
1. Order types Parameters - OPL8. (if you are creating new order types then OPJH)
2. Check Control - OPJK
3. Confirmation Parameters - OPK4.
4. Order Print Parameters - OPK8.
5. Order Scheduling parameters - OPU3.
6. OPPQ & OPPR for Plant Parameters and MRP Group Parameters.
Regards,
Prasobh
Dear,
Once u have created planned order against that material then u can not change /Remove the REM Mfg check from the material master.
First u should close all the planned order generated with respect to that material.
Manually remove the ref Mfg indicator from the material master
Note:
Check the costing point of view also.
Suppose if ur going thr' preliminary cost estimate then u have to do the std cost estimate for that material.
settlement profile which assigned to the order type.
Please refer this useful help also,
https://www.sdn.sap.com/irj/sdn/wiki?path=/display/erplo/discreteManufacturingVsRepetitiveManufacturing&
Regards,
R.Brahmankar
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Tony,
From the PP Perspective,
1. In the material master you need to Remove the REM Indicator, REM Profile from the MRP4 view.
2. Delete the Existing Production Versions.
3. Create Work Centers. Flag Existing production Lines for Deletion.
4. Flag or Delete the Existing Rate Routings.
5. Create Routings.
6. Create Production Versions if required.
7. Cost Roll-up to be done using CK40N.
All Transaction Data to be closed before doing all this.
Regards,
Prasobh
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
100 | |
12 | |
11 | |
6 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.