on 10-13-2008 1:57 PM
Hi,
I am New to BO Enterprise XI R3. I want to schedule the Crystal report which takes Date Range as parameter. Is any option available to calculate From Date automatically based on Current Date based on the range required?
Currently, Parameter option accepts parameters and enterprise process the report for configured parameters. In this case, report always prints only for configured date range eventhough report generated after one month. I am expecting report has to print data for date range (eg. 1 weeks, 4 days, or any range) based on system current date.
Thanks in Advance,
Venkateswaran.P
I'm am in the same situation. I need to be able to have the date parameter dynamically change based on the current day's date when I schedule a report. However, because this parameter comes from a Stored Procedure from the database, it cannot be modified in the Report Designer (as far as I know). I've tried to set a default for it to use "currentdate" but it doesn't seem to take. Anyone know if this can be accomplished in the scheduler?
Thanks
-Tom
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Guys: Any idea how to go about it?
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
86 | |
10 | |
10 | |
9 | |
7 | |
7 | |
6 | |
5 | |
4 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.