MRP create 1 PO with several line items

Hi,

I have the following requirement.

Material A demand is 5 PC

Material B demand is 3 PC

and both are procured from same vendor

After MRP run 2 seperate POs are created.Now my client wants only 1 PO to be created instead of two and that one PO should have 2 line items for each Material A and Material B.Please note that the header material for A and B are different and hence I can not define the BOM to take care of this requirement.

Please suggest. Rewards