Table which links Schedule line number with Dispatch for developing a SD Ba

Hi Guru's

Is there any table which links Schedule line number with Dispatch for developing a SD Back Log report.

For Ex. the Schedule line 19.10.2008 is having - 500 no's to be dispatched

and 25.10.2008 - 2000nos to be dispatched

I will dispatch 250nos on 19.10.2008 and 22.10.2008 250nos

in my Zreport how to link both dispatches against Delivery date 19.10.2008

Thanks in Advance

Regards,

Sai