Hi Gurus,
I want to Map the Calibration of the Equipments in Plant Maintenance.
There are some Equipments that are sent outside for the calibration.
1) Please advice me should I have to create the Material for Every Equipment which I am sending outside for Calibration.
2) What will be the Material type for these Equipments.
3) How I can send the Material Equipment against Service PO. Should I hv to send the Equipment to the Store after dismatling and with what movement type.
Help with document or document link is highly appreciated.
With best regards,
Narendra
Hi
1] Create Equipment Task List ,in that task list's operation you mention PM03(for external service ) here it required purchase Data & for services you can use service sheet masters or create .
2] Create Maintenance plan for that Equipmetns .
3] Shedule that plan , after execution this plan you will get a order.
4] PR is genrated there automatically Because PM03 is using in task list , so check the PR in IW32 or IW12 you can get PR no
5] Through this PR No. you can create Service PO
With Regards,
Utkarsh
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear Utkarsh,
thanks for that info.
This procedure is basic , but I need some info after the creation of Service PO.
Can u send Equipment outside against this PO.
For that should I create Material for that Equipment.
How the Equipment will be transfred to the Store ( Material movement).
Narendra