Actual cost split

Dear Experts,

I have a requirement from my client for cost component split in actual costing. I explain the requirement.

Say i manufacture a Finished good A.

The BOM

structure is as folllows:

Finished Good- A

-


SFG-B + Routing operations to manufacture A

-


SFG-C + Routing Operations to manufacture B

-


RM - D

RM - E

Routing Operation- Lab, machine, power, setup etc.

When i see my actual cost report for Material A- standard SAP displays consumption cost element of SFG B + routing operations.

The requirement is - SAP should show the Consumption of RMs D & E instead of consumption cost element of B and C. Because thier logic is- finished good A is made up of RMs D & E and routing operations. The BOM structure has come in- because they are stocking the SFG B,C intermedairy production period.

Is there a good way of representing the final FG cost in terms of RMs + routings at all stages of production without resorting to ABAP code.

I feel this is very common requirement in South Asian manufacturing industry.

Thanks in advance

Regards

V.Satish