on 10-10-2008 7:55 AM
hello all,
Wht is last reporting point in a Production order?
Regards,
Ranjit
Hi,
The terminalogy will be little different.
For Production Order scinario: Mile stone operation.
Yes, if you are having the mile stone operations in your routing..
Then the last operation should be a Milestone operation.
There can be number of milestone operations in the routing..
If you are using the Auto GR, then the Last Milston operations should only one operation which have this..
Check these carecteristics in the Control key o your system and decide on..
Regards,
Siva
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
There is no concept in reporting point in production order. Reporting point used in REM as a reporting point backflush. This is used to confirm the material at each operation wise. Moreover you can post scrap to respective operation.
Regards,
Dharma
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Ranjit,
As the name says, this is the LAST Reporting point Operation defined in Rate Routing for that material. This is NOT relevant for Production Orders, it is relevant for REM - Planned orders only.
Regards,
Prasobh
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
99 | |
11 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.