cancel
Showing results for 
Search instead for 
Did you mean: 

issue is related to wm and qm .

Former Member
0 Kudos

hi

this is the issue ,

Store do GR, Material route for QA Inspection. After QA Usage Decision

make, WM post change number generated. Material will be at 922-TR Zone

interim area pending for post change to be completed.

When there is another GR, QA Inspection and Usage Decision done for the

same material(i.e. where there is same material existing in 922 interim

area), system will assigned the same quant for the material. This

causes error while store trying to complete the post change for the

second material who having the same quant.

regards,

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos