Hi experts,

I would like to ask, when I try to run MRP (MD02) system generated planned order will always has an error message "62: Scheduling: Master data inconsistent".

How to aleviate all 62 exception messages that appearing on plant xxxx materials.

I did checked on the routing data, and I am very sure that the routing is there and is valid. When I go into the planned order (display mode), I can see that the planned order has selected a routing (under the Detailed Scheduling window).

I really have no idea why system telling me my master data is incorrect.

Can anyone give me a hand?

Many thanks.

Regards,

Tags:
replied

Hi

Answer is pure assumption

Pls check the OSS note - Note 88505 - Planned order upload generates exception message 62

Pls take opinion from SAP / Basis team, if you want to implement the note

Regards

Madhan