Hi all.
I need associate the same material the a material list to two operation
of route in CA01, but only can associate a material to one operation. push the botom 'Componet Assig'.
thank.
Hi
If you want to assign the component to two operations:
go like this:
In the BOM of that product, add the component two times.
The you can achieve.
The example for this:
same bolt cn be used in the machine assembly in two places in two operations.
add this bolt twice in the BOM .Assign this to two operations.
This is the sdt SAP.
Regards
YMREDDY
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Thank Reddy.
But , I Think that this SAP solution is not very correct, because
I have several route for same material with different operations.
Anyway thank for you answer.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Reddy, sorry for delay.
Think, I have not expressed correctly. Sorry.
I write a example.
Material List product (P1).
this material list uses the component (C1).
In the transaction CA01 for product P1:
Route 1 for product P1:
Operation 1 use component C1.
Operation 2 use component C1.
Route 2 for product P1.
Operation 1 use component C1
Operation 2 use component C1.
Operation 3 use component C1.
According to your response,
Do I must to create three entry for C1 component for material P1 or two entry?
Thank