I am using ECC 6.0 and and am on the planning table screen MF50. From this screen I want to backflush. On MF50 I went to - Quantity Change > Backflush but see that for 'individual cell' and 'complete column' is not highlighted. Is there another way I can do backflush from MF50.
thanks
Hi,
MF50 is planning table , MFBF is for confirmation . one doubt what is the need of confirmation during planning itself.
You can create a MFBF icon by navigation profile.
Just check it, whether its solves your problem
thnks & regds,
R.Prabu
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear,
We backflush the quantity which is assigned in planning table
We asign the qunatities to the prodution line Select the column vertically of the shift which you want to backflush and go to "Quantity change" and press backflush...individual column.So you do the backflush quantity as per the production line here.
Please check this for more details about navigation profile
http://help.sap.com/saphelp_erp2005/helpdata/en/c6/c04942da51690de10000000a155106/frameset.htm
Hope this helps
Regards,
R.Brahmankar
Summary
Symptom
The backflush of a planned order with MF50 terminates with a dump 'TABLE_INVALID_INDEX'.
Additional key words
Backflush, LCOBPU55
Cause and prerequisites
You can carry out the backflush via the detail dialog box (by double-clicking a planned order). The problem occurs if you carried out a change in quantity on the detail dialog box for the planned order before the backflush.
This combination is not allowed.
As a rule, the backflush should not be carried out via the planning table. The table is a planning transaction and not intended for the actual data entry. There are stand-alone transactions for actual data that you should use instead of the table (MF40 ...).
Release 4.6 and later:
Since an easy backflush exists as of Release 4.6 in repetitive manufacturing (new Transaction: MFBF), the system no longer supports the backflush from the table.
Solution
The simultaneous change in quantity and backflush in the detail dialog box for the planned order is trapped.
It would be better if:
The backflush was not from the planning table but to use the backflush transactions instead.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
In MF50 screen, try to create new icon with MFBF. If you click this system will go to MFBF screen.
Regards,
Dharma
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
108 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.