on 10-08-2008 6:52 PM
We are loading ROH costs into Planned price 1 fieild so that the costing run will pick them up for costing. We have high volume of materials where the changes needs to be made. I know we can use LSMW or CATT but is there any other way without using them? I mean some transaction where we can load all materials and their planned prices?
Thanks in advance
You can maintain a price in the Future Val. Price field using X-action CKMPRPN. There are some more fields available for use in that transaction, but not Planned Price 1.
To input specifically into the Planned Price field, use SCAT. By far, that is the easiest... unless you have a BDC program built into your system.
Cheers.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hey,
We already checked option for CKMPRPN but it is updating in Accouting 1 view. Our Valuation variant doesn't have the option of picking the value from Accounting View 1. As it is a global variant we don't want to change that. So i am wondering if we have any Tcode like CKMPRPN to update in Planned price 1.
What is the issue here:
1. Uploading a price into the field Planned Price 1?
or,
2. Using a standard SAP transaction to upload a price to the Planned Price 1.
If its the first, you can do that using SCAT (my preferred option) or LSMW. If there are too many CATT Scripts / LSMW programs floating around, delete the ones that are no longer used. Not sure why that should be an issue.
If its the second, well, all the best...
Cheers.
Hello
The best way of putting planned price in MM is LSMW or LGBDC.
regards
Dinabandhu
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
91 | |
7 | |
7 | |
4 | |
3 | |
3 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.