Activate Cost Component Split in Controlling Area Currency

Former Member
0 Kudos

Hello,

I have controlling area currency USD and company code currency INR. When I do WIP run then system is giving error messages "contr.area currecy is missing" and "not find valid cost component structure" and suggesting to maintain "Cost Component Split in Controlling Area Currency".

When I maintain then after that I am not able to run CK11N for std.cost estimate only with the error "cost componenet spit costed with zero" and also system giving this message on front screen of ck11n, means not allowing to go into ck11n result screen.

Could you please give me some tips or check point on this issue.

Thanks

Regards

Ravi

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

Thanks friends,

It's working fine now.

Thanks

Ravi

Former Member
0 Kudos

I'd revert to the Cost Component per Co Area currency config that you were forced to delete (as per your other post) - but this time, just for a Costing Type or a specific Val Variant and check the results.

Maybe that'll throw some light... also check if you maintained all the Exchange Rate config in your system... check General Settings for all the config that is required.

Cheers.