Hello, Expert,

When i doing the process order confirmation, total 100 pc for material A, is it possible to post 95 pc into quality inspection (stock type control for GR in process order header) and the other 5 pc posted to Blocked stock? In our real practise, these 5 pcs are damaged products.

If it's possible, which movement type shall i use and how it works?

Secondly, in the process order, can i consume the components in blocked type? (not Unrestricted Use)

Many thanks,

Vincent

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi,

Activate inspection type 04 in QM view of material master .

Do the GR against production order inspection lot is crated.

Do the UD for this inspction lot and post to blocked or un stock .

Regards

Sandeep

Former Member
0 Kudos

Hi,

Thanks for your response.

What do you mean by "UD"??

Not possible to have good receipt for QI stock and blocked stock in one-shot?

Regards,

Vincent

Former Member
0 Kudos

Hi

UD means Usage Decision.

1. You can mark it as a scrap quantiy for 5 pc.

2. You can't consume the blocked stock components unless it is moved to Unrestricted stock.

Experts, Correct me if I am wrong