on 10-08-2008 9:19 AM
Dear all
my requirement is to create a multi level bom.
i can explain by an example
i am having a FERTmaterial name as FERT-A
under that 3more FERT materias are there Called
FERT1.
FERT2
FERT3
and 3 semifinishhed product which ll be assembled in the site only
called as
HALB1
HALB2
HALB3
and we also has some loose tools which alo been assembled at site
Spare 1
spare 2
spare 3
now we are despatching each group separately
like FERTs ,HALBS and Loose tools and we are billing them as per the despatches
now we need that when we prepare a bom it should show all the bom items in the sales order and the parts which are despatched they should be come as inactive or where the parial delivery of some of the bom item has happened should come with the message or some information that the partial delivery has happend.
so how to configure all this in SAP.
Edited by: subu sd on Oct 10, 2008 7:52 AM
no answer
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
110 | |
12 | |
11 | |
6 | |
5 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.