Material Valuation

HI All,

We need to make Material valuation at Lot level means i procure certain material in Lots (1Lot = 100 Pcs).where Piece is the Base Unit of Measure & Lot is the Purchasing Unit.How can i perform this ..is there some feature in ECC 6.0 regarding the same.