Hi Gurus,
Can you please tell me what actually we do in rough cut palnning? At what point it is required? What are the different steps(T- Code) in rough cut planning? What are settings required for that? I have gone through the document.....Still i need it. Please help me.
Regards
Rajib Pathak
Dear,
Rough cut capacity Planning is to check capacity of Bottele neck work center.
Main Purpose of Rough cut planning is to see how realistic is our production plans.
We can check whether we have enough resources to complete the Prod plan .
Normally Capacity loads / utilisation (reqd vs available) are of high importance when we use rough cut planning.
It is used for resource levelling, i.e. capacity levelling. Rough-cut planning is based on time buckets and determines requirements of resources (machines, humans, production resource tools) and materials.
Following link gives you a good information. This may help you.
http://help.sap.com/saphelp_46c/helpdata/en/8a/a5905c4adc11d189740000e8322d00/frameset.htm
Please refer this thread for details,
[Rough cut Planning|https://forums.sdn.sap.com/click.jspa?searchID=17082831&messageID=6273263]
Regards,
R.Brahmankar
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
ok
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
108 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.