on 10-04-2008 2:22 PM
Hi Gurus
I am maintaining Prod. Stor. Location as RMSL, and in Storage location for EP as IGSL. Now the PO is going with IGSL. While doing GR also the material is going to IGSL as Quality stock. While doing UD also same storage location ie IGSL is coming as default to unrestricted stock.
Here my question is can we default Prod. Stor. Location for Unrestricted Stock, keeping IGSL in PO as initial storage location?
Regards
Ravi
Hi
There are three methods do that,please find it below
1. while creating PO: Uncheck the quality inspection checkbox.
2. While making GR : Uncheck the quality inspection checkbox.
3. To make it default for paticular material, then go to Quality Info Record ,change the validity date & set as no inspection required.
Regards,
Ravindran
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
103 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.