on 10-03-2008 11:57 AM
Dear All,
I am trying to transfer a multi-level BOM to various Network activities in a project.
After doing CN33 successfully, when I see the Project structure in CJ20N, only the 1st Level Item is shown in structure.
I tried to explode the same by selecting the BOM item in structure and then EDIT>Component> Explode BOM. but the 'Explode BOM' is not active.
Kindly help.
Thanks in advance:
Vikas
Thanks a lot gentleman for extending your support.
Regards,
VDS
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Explosion of the BOM in CJ20N is possible when u assigne manually the BOM in CJ20N as component there itself.AS u assigne the BOm u have to select the activity and u can see BOM explosion can be done in Edit-componenet.
Secondly In CN33 select ur Project and got to Enviornment >> Selection parameters >> Select Multilevel option there and trnasfer the BOM
Rgds
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Thanks a lot for ur responses.
Now I am able to see the dependent requirements for my BOM header component.
I would like to describe here what I am doing.
1. I have created a BOM (semifinished product) with 2 items ( raw mat.) ( item cat.-non-stock).
2. I have attched the BOM as a material component to one of the network act. as a stock item. System generates a reservation for the same.
3. Then I run MD02, with header mat in mat.field & MRP control param. in the sequence 1,3,1,1.Once I enter, on next screen, there are some statistics showing no. of materials planned, no. of planned order generated and no. of PReq generated.
4. For one of my BOM items system generates a Preq. while planned order for the other one.
So, I need ur guidance, how wud the purchasing cycle will proceed ahead in this case.
Thanks
VDS
Hi,.
In MD02 you r going to run MRP itemwise rather in MD51 for all materials u assigned to WBS u can generate requirements.
In MD02 double click on purcreq u will get a sub window double clicking on Pur Order tab u can generate PO and if u doubleclick on planned order the Popup window will hv options for prodn order,Purchase order depend on procurement indicators u mentioned in Materila master.
Rgds
Close the thread if satisfied with answer.
Edited by: Shrikrishna Rasam on Oct 6, 2008 3:21 PM
did you select multi level when doing CN33?
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
98 | |
11 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.