cancel
Showing results for 
Search instead for 
Did you mean: 

Test Equipment

Former Member
0 Kudos

Dear all,

1. i have maintained task list in T code IA05 and assign inspection characteristic there to operation maintained there 300 inspection point, and control key PM05, Usage 4(only for maintaince )

2. i have Maintained maintainance plan in t code IP41 and assigned that task list there and my object equipment there.and order type PM05 also there.

3 then when schedule that maintainance plan in tcode IP10 and release. in background maintainance order created. ( which is already released.)

when i check in QE51N with inspection lot orgin 14, but no inspection lot is generated.? wht should be problem?

and where should i maintain inspection lot origin 14?

Regards

Pravin

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

hi

1. pl check wether the inspection type i sassigned to the oredertype.

Maintenance and Service Processing>Maintenance and Service Orders>Functions and Settings for Order Types-->Assign Inspection Types to Maintenance/Service Order Types.

-ashok

Answers (0)