Dear all
We have attached DIR (Document) as line item to Material BOM (CS01). We have given reference point to DIR line item and also to material line item.
Now I went to Project system and assigned it using reference point.
After this I want to transfer this BOM, when I transfered it only material line item get transfered and not the DIR.
Can you tell me the reason?
Regards
Sandeep
Dear Sir
We have followed this process.
We have attached DIR (Document) as line item to Material BOM (CS01). We have given reference point to DIR line item and also to material line item.
For example,
Line Item 1 = Material M1 ; L; reference point assigned
Line Item 2 = DIR 1 ; D; reference point assigned
Now I went to Project system and assigned the BOM to network activity using reference point.
After this I want to transfer this BOM using t-code CN33, when I transfered it only material line item (Material M1) got transfered and not the DIR (DIR 1)
We checked and found SAP Note 212337 (No transfer of document assigments) to resolve this problem, as per this note the solution is implement the source code correction. But this note is applicable to version 4.6C and we are using ECC 6.0
We are not able to proceed further, please help in this regards.
There is one more Note 422223 for similar problem which is again for 4.6C
Thanks and Regards
Sandeep
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
108 | |
12 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.