Hello SAP-Guruu2019s

When MD01-Online(MRP) is carried & what is the advantage of this.

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi,

MD01 is used to run MRP for all the materials in the plant.

To run MRP system use control parameter from MRP group if you assigned. MRP group has higher priority than intial screen of MRp run.

So at a same time we can use different control parameter for different material by using MRP group in the single MRP run whether it is Online or Background run.

To run MRP for MRP area or Multiple Plant, we can use MD01 by using scope of planning.

Regards,

Dharma

Answers (3)

Answers (3)

Former Member
0 Kudos

Dear Niranjan,

MD01 and MDBT are widely used in company for whole plant . MRP is generaly done every night or weekend depends on companies decision but it is done in MDBT ( background ) .

If you change any master data like BOM or routing then to see the effect you may run Md02 . Md01 and mdbt might load system because of heavy mat processing thats why done at night time .

Neal

Edited by: Neal Gibson on Oct 3, 2008 12:38 PM

Former Member
0 Kudos

Dear Niranjan,

For a single material, we may run MRP through MD02(single item-multilevel) & MD03 (single item-single level).

A plant may having n number of products. In such circumstances, we may go through MD01 to perform MRP run for all the materials in that particular plant.

Here we have to create a MRP area. As you know a MRP area may be a plant or a storage location or a subcontractor. For these MRP areas we may run MRP separately. That means materials under particular plant or storage location or subcontractor are subjected to MRP.

Thanks & Regards,

Jeyaraman.R

rupesh_brahmankar3
Active Contributor
0 Kudos

Dear,

We use the transaction MD01 for online run of MRP for entire plant online, and MDBT for back ground job.

So it will plan all the material in plant or MRP are which are relevent for MRP with Scope of planning

Before that create a scope of Planning in transaction OM0E. Yo can create scope of Planning for one plant or many plant at a time.

Regards,

R.Brahmankar