Dear Guru,

When we are trying to generate the bill systems throws the error as "no statandard cost estimate found" whereas the material is a kmat material.

Following error msg is appearing:-

No standard cost estimate could be found for material "123456"

Message no. K/834

Diagnosis

In Profitability Analysis, an attempt was made while valuating with material costing to read for material "123456" a standard cost estimate released on posting date "02.10.2008".

The system has discovered that there are no error-free standard cost estimates released in plant "BP01" on the specific date "02.10.2008" for material "123456".

The material cost estimate is accessed according to the CO-PA Customizing settings for costing key "YG1" under Define Access to Material Costing.

Display Cost Estimate for Material

Display Material Cost Estimate without Quantity Structure

System Response

It is not possible to process the document further.

Procedure

Check your system settings.

thanks in advance.

Edited by: AK PAT on Oct 4, 2008 10:53 AM

Edited by: AK PAT on Oct 4, 2008 10:54 AM

Accepted Solutions (0)

Answers (4)

Answers (4)

rupesh_brahmankar3
Active Contributor
0 Kudos

Dear,

Please refer this thread,

https://forums.sdn.sap.com/click.jspa?searchID=17082786&messageID=6264022

Regards,

R.Brahmankar

Former Member
0 Kudos

Hi, Go to VA02 and select your Sales order of the Billing document where you got the order. Then go to menu 'Extras' and select 'Costing' in the said menu. Or you can use Control +F7. Then system will ask whether to create sales order cost estimate. You can create the cost estimate. If you go through VA03, you can view the sales order cost estimate. At the time of billing, the system requires Sales order cost estimate to populate both SD and COPA. Trust this helps much! Cheers!

Former Member
0 Kudos

Hello

Prerequisite for costing

Check the material master setting, costing, with qty str, lot size, procurement type (E or X).Material type (same like HALB/FERT)

BOM costing bom with active status and correct validity date

Costing variant- imp poitnt to check in,,,update functionality (material master update on costing release), valuation flag(legal/PCA/Group), qty str,,,costing BOM validity date,,,,

Regards

Dinabandhu

Former Member
0 Kudos

Hi,

In your case as the material is KMAT(Configurable), you need to have a sales order based cost estimate created and marked in the sales order.

Further you need to have a costing key defined for sales order cost estimate.

This costing need needs to be included in you valuation sequence.

Hope this helps you.