cancel
Showing results for 
Search instead for 
Did you mean: 

COOIS: Sys staus

Former Member
0 Kudos

Hello friends,

Please advise me with SYS staus in COOIS report. I am looking for a report that provides me the components currently in WIP.

If COOIS is the best report, please help me with the selection criteria.

In COOIS, should i enter the SYS STATUS at Header level or Component level? Also what SYS STATUS OPTIONS should i Include or exclud for WIP report.

Sanjay

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

ok

rammohan_shenoy
Active Contributor
0 Kudos

Sanjay,

Technically in SAP any process/ production order that is Released (status REL) and not yet Technically closed (TECO) is considered WIP. So if you are looking to find production orders in WIP use above 2 status (in combination REL and TECO exclude) in COOIS at header level to get the list of WIP orders.

Hope this helps. Else please come back.

Thanks,

Ram