Dear All,
My Client want to chage the % Overhead rate periodically. We are mainting this in SPRO - Controlling.
Let me know the T. Code for this. If possible??
Thanks and Regards,
Atul R. Rajmane
Dear,
We maintain overheas rate in costing sheet.
use transaction KZA1.
Material Overhead system looks for material master --> Costing2 tab where we define material overhead key.
In Config->product cost we assing a overhead key to a overhead group.
In costing sheet row for material overhead - we maintain Overhead rate assinged to a Overhaed key.
we will see the actual OH - T.Code - KSI4
Please refer ro SAP Note 164222.
Regards,
R.Brahmankar
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Check this report
S_ALR_87008275 - Define Percentage Overhead Rate
once you change percentages,this will effect all the transactions,like material cost estimate,actual overhead calculation production order and if you use same cost sheet in other objects like networks,wbs,internal order etc..
Thanks,
Rau
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
100 | |
11 | |
10 | |
6 | |
6 | |
5 | |
4 | |
4 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.