P.O RELEASE PROCEDURE

Hi guys,

I have created the characteristic with the table KOMP and filed NETWR as a ref and in value tab I have given 2 value that is below or equal to 100000 and more that or equal to 100001 and class ref ring the same char.

I have created created two stategy ref one release code in one strategy and two release code in second strategy.

But when I create the P.O only first strategy which in below 100000 is reflecting even if I increase the value to more that 100001.

Please let me now which that place I need to correct the settings.

Thanks

Dhanu

Former Member
Former Member replied

Hi,

Please create the characteristic with the structure CEKKO and maintain the values in CL20N transaction for the combination of Release Strategy and Release Group.

Regards,

Narayana.