on 10-01-2008 7:00 AM
Dear All,
my Client's requirement is to see the PR column in the front at PO screen.PO is made with ref to PR
Client don't want to scrol the screen everytime when he is creating the PO.
so,I want to shift the PR column after the item number column in the PO screen.
Pls reply soon.
thanks & regards
Hi,
Click and drag that column where u want then save this layout as the varient in PO screen.
Make this created varient as the default varient.
OR
Instead of changing the standard SAP settings u can use the document overview screen to search the PR
Then select the pR and click on adopt details tab,or drag it and put it in the baskate near Po document type field.
regards,
sujit
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Select column "Purch.req." and move it front in ME21N and stop on the necessary place and similary do with column "Requisn. item".
Now click on "Configuration" button which situated on the extreme top right of the item overview table (Yellow colour icon) and create variant starting with Z*** and Activate "Use as Standard Setting" and Save.