cancel
Showing results for 
Search instead for 
Did you mean: 

Document date for PO..?

Former Member
0 Kudos

Hi all

I was using IDES, here i have done configuration .

while creating the PO , the document date in PO is showing 1 year before ,,i.e for example today if i create a po document in po is 1.10.2007..

Please guide me were to do the setting for document date in PO

Or any calender and time setting i have do for my comapny code ..?

At the same time only i m getting error "enter rate of EUR/INR of 1.10.2007 in ur system setting ..

pls guide me

Thanks

sap-mm

Accepted Solutions (1)

Accepted Solutions (1)

former_member192897
Active Contributor
0 Kudos

This is due to system time Settings. Your system Time Might have set to One Year Back ie 2007 During IDES installation.

Due to This only system is Behaving like this.

Go to Any SAP Screen and Go to Menu System then click on Status and Check the Expiry Date of your SAP System and Possible Change the System Date.

Go to OB08 and Select Echange Rate Type M and Save.

You Can Use Copy Function Just Copy any old with Exhcange rate type M and Change the Currencies and Save.

Could you Please Listen properly what Others are Suggesting before Closing the Issue

Edited by: Kàlyànji Anàndji on Oct 1, 2008 10:27 AM

Answers (3)

Answers (3)

former_member581212
Active Contributor
0 Kudos

hi,

Check for the Default values in the PO.....

Maintain the Exchange rates in OB08....For EUR/INR vise versa....

Also, you can keep these exchange rates fixed via using Fixed exchange rates indicator in the Po header....

hope it helps..

Regards

Priyanka.P

deiva
Active Contributor
0 Kudos

Hai,

The PO doc date is defaulted from the System date settings. So check the system date.

Former Member
0 Kudos

hi

goto OB08

enter the exchange rate EUR to INR A , and INr to EUR (m type exchange rate) .

Regards,

vijay