on 10-01-2008 3:57 AM
Greeting for all gurus.
Process
We have three set of operations , one will be blend, , other will be cured and the third will be finished goods.
Basically one FG and three components , the components will be consumed in the first process. The same FG materials will be used for the 2nd / 3 rd Process
,1) we want to confirm the first set by making auto GR/GI
2) The Overlapping is 8 weeks , the 2nd operation should start , after that and the third operation should wait for 6 days . 2ND operation is confirmation only.
3) The third will be for standard process, Only GR
We have to use the same materials . Say 1st process O/P will be 50,000 and second process will be 40,000 and third will be 30,000. We want to account the loss in between the 1st and 3rd operation . 2 nd operation , no need to record .
Requirements - Discrete Manufacturing
u2022 How to set the control key for three operations.
u2022 How to confirm every stage in a single production order.
u2022 How to consider all the operation days in the Production order
u2022 How to report loss in various stages
u2022 How to print all the operation at various stages in the shop floor
Any help will be highly appreciated
Thanks
JJ
Thank for your help. How to confirm the production order for variuos operation. i am getting the error , as the sequence is not set . Do we need to maintain any sequence in the production order?
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Thank you very much . It works for me .
I will give you full points.
One more qn .How to satisfy the auditors ?
They wants to see in standard sap about Work in Process, and confirmation of the 1st operation .
which is the best way to show them , as tables have restcited access .
Please help me the correct table and alternate way without going to Z report
Thanks
JJ
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Thank you , let me try with the option with the continous prod flow
--- Where to set the sequence of operation -
i am getting error , No zero sequence assigned the production order.
I want the system to consider the 7 weeks for this production time. How to do this ?
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Depending on the time that you have entered in your routing with continuous flow production, the formula assigned in your work center scheduling tab, you will get the processing ime for the individual operations in production order. Check up with all the operations whether you get 7 weeks duration.
If you are using the "standard sequence: of operations from routing, no need to enter "0" for the sequence.
-Thaila Shree
Our requirement is single materials , confirming various stages , reporting loss, production order should contains 7 weeks , clearly explaining the various stages
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Thank you very much
As you use single production order, input the overlapping time in routing in "Min Overlapping time" = 8 weeks (in no. of working days) for the first operation and 6 days for the second operation after selecting "Required Overlapping". ( If you mean it as wait time, you can control the same with the wait time in work center).
----I already set it , but it is not considering the days , it took only the base qty and no of hrs calculation
in the prod order ,Our base qty and hrs will set for two hrs only . the remaining 6 weeks is not consider -
With Single Production order, you cannot do goods receipt after the first operation. Since 2nd and 3rd operation are pending, why do you want to do goods receipt at this stage?
----- We want to account the loss , as it will be loosing pounds at various stage -
Carry out confirmation for the sequence of operations in CO11N with the yield qty and use reason for variance as the loss of qty. Using confirmation tables, create z-report to know the actual qty after the last operation. ..
--- Where to set the sequence of operation - i am getting error , No zero sequence ---
I want the system to consider the 7 weeks for this production time. How to do this ?
You can print the operations from pull-down menu in CO02 - order - settings - List control - Op. control ticket
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Try with "Continuous flow production" instead of "Required overlapping".
Confirm only the actual qty available with you as the yield qty at the different stages.
I meant the sequence as first oprn(10), second oprn (20) and third (30) where you can book for the corresponding oprn.
-Thaila Shree
Hi,
As you use single production order, input the overlapping time in routing in "Min Overlapping time" = 8 weeks (in no. of working days) for the first operation and 6 days for the second operation after selecting "Required Overlapping". ( If you mean it as wait time, you can control the same with the wait time in work center).
With Single Production order, you cannot do goods receipt after the first operation. Since 2nd and 3rd operation are pending, why do you want to do goods receipt at this stage?
Carry out confirmation for the sequence of operations in CO11N with the yield qty and use reason for variance as the loss of qty. Using confirmation tables, create z-report to know the actual qty after the last operation.
You can print the operations from pull-down menu in CO02 - order - settings - List control - Op. control ticket
Hope this helps..
-Thaila Shree
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Thanks for the reply
All the operation is the same material. The LB will be reduced while drying .
So i want to use the same materials for all the process , accounting the loss.
Is it possible in SAP
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
can you first tell,
u said u want GR/GI in first opearition, why is that?
can you call the material is finished after 1st opearation. can u sell that FG???
if not then dont think of such things.
again in last u want GR for third opeartion, what was ur in?? when u done Gr at 1st place???
sorry but ur writing dosent make sense to me.
i can understand, u are not able to distinguish between, actull and SAP.
if i am not wrong, u need to go through all the process to get final FG, am i right?
Regards,
Pravin Mukkawar
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
108 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.