We have three set of operations , one will be blend, , other will be cured and the third will be finished goods.

Basically one FG and three components , the components will be consumed in the first process. The same FG materials will be used for the 2nd / 3 rd Process

,1) we want to confirm the first set by making auto GR/GI

2) The Overlapping is 8 weeks , the 2nd operation should start , after that and the third operation should wait for 6 days . 2ND operation is confirmation only.

3) The third will be for standard process, Only GR

We have to use the same materials . Say 1st process O/P will be 50,000 and second process will be 40,000 and third will be 30,000. We want to account the loss in between the 1st and 3rd operation . 2 nd operation , no need to record .

Requirements - Discrete Manufacturing

u2022 How to set the control key for three operations.

u2022 How to confirm every stage in a single production order.

u2022 How to consider all the operation days in the Production order

u2022 How to report loss in various stages

u2022 How to print all the operation at various stages in the shop floor

Any help will be highly appreciated

Thanks

JJ

Former Member
Former Member replied

As i mentioned earlier, in CO11n, enter production order no, operation no -10 , yield qty, actual dates and any other data as required. Do not enter any data in sequence field. Now system will pick up the "standard sequence" maintained in the production order.