on 10-01-2008 4:16 AM
Hi Friends,
1. In Work Centre : In the capacity tab and fields inside when we give shift timings and length of breaks system proposes the capacity in MIN , which means for it to work those many MIN are available
we require to enter the capacity of the conveyor in Number of parts made on it for example no.of vehicles producing capacity of the conveyor
for our report development purpose we need to have it . As different conveyors have different production capacities , we can not take this available time as it comes same for all
is there any field in creating work centre where we can input and store the capacity of that conveyor in terms of production .
2. Similarly in routing we have say 10 sequences , among those one is main line operations , few are of subassembly operations and some are of inspection operations
for developing report we need to seggregate these sequences in to three categories and some where in the sequence we have to mention that this belongs to thsi category ( categories are main line , sub assembly , inspection )
can i have some helpful inputs on these
requirement is while entering a sequence its description we shoudl be able to flag it as either mainline operations sequence or sub assembly operations sequence or inspection operations sequence
how to address this ?
regards,
madhu kiran.
analysed
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
In work center capacity header, it is possible to maintain in terms of time units. You can maintain your capacity in routing with the base qty= No. of parts and machine time= time taken to produce the no. of parts. With this, your capacity is defind for the particular productwise and after planning you can evaluate ur capacity in CM01.
For segregation, try with different control keys and develop using Z-report.
Checup up whether this helps for your requirement.
-Thaila Shree
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi friend,
this will not solve the requirement as
time available can be maintained in work centre
but in routing in operation the base quantity what we give is with reference to the standard value time what we enter means for that operation how much time is taken with referring to the base quantity ,normally we maintain in our case base quantity is always 1.
any other way or some more clarity in capacity calculation of conveyor is requested
segreegation of sequences could not be done by some Z REPORT . so many routings so many sequences how can we seggregate
at the time of creation of sequence in routing we should be able to use some field
are there any other fields we can activate in work centre and routing ?
regards,
madhu kiran.