Hi,
when I use planning strategy 52 at assemly level , I create PIR for that assembly level. When I run MRP system creates planned order with VP type only for that header level. i am not geeting any planned order or purchase requistion for dependent requirements. can you please tell me .what could be the problem
Regards
Karthikeyan
Hi,
I tried with strtegy 10, system plans for all subassemblies and components.
I created MRP type as P by copying Mrp typr PD.
is it ok?
All the other parameters were maintained .
Regards
karthik
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Following is my requirement.
Assembly A
MRP type : PD
Stg group : 52
consumption parameters maintained.
Ind/coll req : 2
PIR created for assembly with Req. type as VSE
Assemly as one component
Component ( external item) with procurement type as F ,mrp type as PD , and stg gruop as 10 no other parameter maintained in material master.
When I run MRP for assembly,planned order is created with order type VP for assembly . but no PR is generated for the component.
Hope my requirement is clear
Regards
Karthikeyan
Hello,
Has dep requirements created for components , please check with Md04.
In header material planned order check with components for BOM explosion. Any exception message for header material planned order .
No need to mantain planning strategy for components, unless it is sale able material and remove the planning stg 10 for component.
Regards
Pradeep
Hello Karthik,
Please Run the MRP with creation Indictor = 2 Always Pur requisition it the Initial Screen. Now system will create PR directly instead of Planned order.
Even if you get planned order you can convert to Pur.Req
The reason is , if you might have select the control parameter = 1 or 3 (purchase requisitions within the opening period and planned orders outside of the opening period.) during the MRP.
If you select 3 ,system will create always planned order , out side the opening period , then you need to covert it Purchase req.
This Period is available for MRP controller as float to convert planed order to Pur Req. This is defined at Scheduling Margin Key.
I hope this will solve your problem , if yes please close the Thread
Regards
Pradeep
Hi Pradeep,
Please understand, when i select the planning strategy as 10 for the same assembly every thing is correct. planned orders are created for E items and PRs are created for F items
In MRP creation indicator is maintained as 1. so system will create PR for procured items.
But when I select the strategy as 52. for all dependenet requirement items i got planned orders with order type VP . this cannot be changed to PR.if the order type is LA you can convert to PR.
Hope this is clear.
Please suggest Any other setting is required to get PR for procured items.
Regards
Karthikeyan
Hello Karthi,
Please Go through once again all of your above replies.You havenot tried to give the information to fix the Problem.
Anyway my final reply in this issue is , In planning strategy 52 , you can produce the components before the Assembly, Please set ind/coll =2 for Components ( not for Header material ) in MRP View.
Now system will create LA type planned order & u can convert it PR for External Item.
Regards
Pradeep Kumar
Dear,
In strategy 52 you can procure comp based on PIR and production of finished products is based on sales orders.
settings:
In MRP 3 View strategy group 52 for fert.
individual / collective indicator 2 for components.
PIR are created for fert.(Requirement type VSE)
For fert planned order will be created with order type VP which is not convertible.
Also Planned orders will be created for comp with planned order no /stck production / procurement can be made with this planned orders for comp
Have you maintained ind / collective ind 2 for
comp .Kindly check and give the feed back.
Please change the strategy and check the result for confirmation purpose. So we can find out the exact problem.
Regards,
R.Brahmankar
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
pls check whether the following settings are in place as given in SAP help
Prerequisites
You must maintain the following master data for the finished product:
Maintain strategy group 52 on the MRP screen.
Set the lot size key EX must be set in the MRP screen because lot size optimization would be incompatible with the allocation logic, which could result in over-planning and incorrect result in the ATP check. You also must ensure that no rounding profile or rounding values are taken into account.
Maintain consumption parameters (Consumption mode, Bwd consumption, Fwd consumption) so that the independent requirements can be found.
For more information, see
Consumption Strategies and Logic. Maintain the item category group (for example, NORM) on the Sales Organization screen.
There are no major implications for the BOM components. However, it is important to note the following:
You need to set the MRP type to P* (or M*) on the MRP screen to plan the components in MRP.
You may want to consider setting the Individual/coll. Indicator to 2 on the MRP screen as a starting point for your master data setup.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.