cancel
Showing results for 
Search instead for 
Did you mean: 

LIV by material document?

Former Member
0 Kudos

Dears:

In SAP 45B , there is a tcode MRHR .When use MRHR , we can refer a GR material document to do LIV.

But when use MIRO(ECC 6.0), I can't use GR document as reference document to do LIV.

Hope someone can tell me , if I can reference GR document to do LIV?

If the answer is yes, pls tell me how to do the setting ?

Thanks very much.

Gary

Accepted Solutions (1)

Accepted Solutions (1)

former_member581212
Active Contributor
0 Kudos

hi,

In PO check for the PO based IR indicator is ticked or wht??

Use GR based IR indicator ...

Check it in 4.5 version...m unaware of it..

hope it helps..

Regards

Priyanka.P

Answers (5)

Answers (5)

Former Member
0 Kudos

Hi Gary,

I have the same problem...

Do you have find a solution ?

Best Regards

Alberto

Former Member
0 Kudos

Thanks.

Former Member
0 Kudos

Thanks for your reply.

I want to know , in MRHR , we can input GR document as a reference document .

But in MIRO , the reference documents categories have Purchase order、 scheduling agreement、

Delivery note、Bill of lading 、Service entry sheet 、Vendor ....but no GR document .

I don't know if MIRO can input GR document as a reference document

And if yes, how to do.

Thanks very much.

Former Member
0 Kudos

Hi,

The T.code is obsolete from ECC5.0 onwards.

If you want to do LIV go to ME2L enter the Selection parameters GR done but not invoiced you can get the P.O no from that you can do LIV

G.Ganesh Kumar

Former Member
0 Kudos

I belive it is not possible in ECC 6.0 but though you can do LIV wrt PO the system will also refer to the material doc created during GR if GR base IV is checked while creating PO.

Regards

Sujoy