on 09-30-2008 8:23 AM
Hai ,
Please help me in getting the following steps---
I am trying this by taking the example from help.sap.com 4.6c and trying to do this in ides ECC 6.0 as I am not having ides 4.6c I taken same master data also.
In Work clearence management , Help.sap.com in the following link example given for ides sap 4.6c --
http://help.sap.com/saphelp_46c/helpdata/en/fe/67ec5c9d6f11d189b60000e829fbbd/frameset.htm
I could not able to get the following steps ,for the same example given in Ides Ecc6.0
Performing Lockout/Tagout
4.Choose . ( not able get this symbol in ECC6.0)
5.Choose .
6.Select Tag.
7.Choose Tag.
Now print out the task list for performing tagging.
8.Choose Process ® Print ® Tagging list.
Tagging carried out on location is confirmed in the system.
9.Choose Tagged.
10.Choose .
The color of the traffic light indicator for the permit switches to green.
Thanks in advance
Dear
kindly press the button second from left (SWITCHING SCREEN) ,then in the new screen select all the technical objects and proceed further
regards
thyagarajan
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear Tyagarajan ,
It is displaying as Function not possible and in detail , It is saying as Operation Work clearence doc not prepared. But the status is in PREP message is I4230. The trafic light is "Yellow" . If I click on the traffic light a sub screen displayed as Approvals - Operational work clearence doc here Permit SFS (tag) -
Approval issued PI is ticked and IFS (tagged) line is no activation . If I sellect IFSand click on isue permit it is saying
Before issueing the approval, set the status ETG
(tagged)
so please guide
Function is not available
Message no. I4230
Diagnosis
You are attempting to perform a function for which not all the
prerequisites were met.
Example
You want to call up the switching screen for an Operational WCD.
However, the Operational WCD is not prepared.
Thanks and regards
yuvaraj
Dear tyagarajan ,
I followed as per the given scenariou in 4.6c
Approving Lockout/Tagout
Use
The work clearance planner gives approval for tagging to be carried out.
Procedure
In the screen List editing u2013 Work clearance application Change, select your work clearance application and choose .
Choose Approvals.
Select the line BTG Tag and choose Approve.
Choose .
The color of the traffic light indicator switches to yellow.
Choose .
Choose until the overview tree appears.
Performing Lockout/Tagout
Use the following procedure to call the transaction: Menu Path
In the Plant Maintenance node, choose Work Clearance Management ® Operational WCD ® Change
Transaction Code
WCT7
Enter the following data: Field
Data
WC document
Number of your Operational WCD
Choose .
The color of the traffic light indicator switches to yellow.
I am not getting any Error , I am not able to move further as I stated .
Thanks and Regards
yuvaraj
Edited by: YEVARAJ. V.S on Sep 30, 2008 12:31 PM
User | Count |
---|---|
91 | |
7 | |
7 | |
4 | |
3 | |
3 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.