PO line item condition to be linked with contract

Hi

In the PO line item condition tab the costs for freight, insurance are specified in different condition types. Moreover it is required to create contracts for freight and insurance.When creating the material PO client wants to link the contract for the freifgt and insurance with this PO line item cost.

How can the contract be linked with the PO line item condition?

Regards