Link contract for freight and insurance to PO line item cost

HI

In the PO line item the costs for freight, insurance are specified in different condition types to capture the cost into the material cost.Moreover it is required to create contracts for freight and insurance.When creating the material PO client wants to link the contract for the freifgt and insurance with this PO line item. How can the contract be linked with the PO?