Revoke of PO Release not possible

Hi All,

We had three level release strategy(three release codes) and now we have changed it to two level.

Now, when I am trying to cancel the release of PO (PO which had three level release and it was completely released) system shows the error message " No new release indicator can be determined"

Please guide..

Thanks in advance.

Pavan

replied

Dear Pavan,

Based on your description, you had inconsistency in your release code.

If you having 3 release level and change to 2, you will create this type of inconsistency

for existing document. Normally it would not advice to change the release strategy when

you have a purchasing document in the system that are not completed yet. You will always

need to create a new release strategy.

For your case, i think you have no option but you have to create back the 3 release level

for you to proceed with cancellation.

BR,

Ian Wong