Revoke of PO Release not possible

Hi All,

We had three level release strategy(three release codes) and now we have changed it to two level.

Now, when I am trying to cancel the release of PO (PO which had three level release and it was completely released) system shows the error message " No new release indicator can be determined"

Please guide..

Thanks in advance.

Pavan

Former Member
replied

Dear Pavan,

Based on your description, you had inconsistency in your release code.

If you having 3 release level and change to 2, you will create this type of inconsistency

for existing document. Normally it would not advice to change the release strategy when

you have a purchasing document in the system that are not completed yet. You will always

need to create a new release strategy.

For your case, i think you have no option but you have to create back the 3 release level

for you to proceed with cancellation.

BR,

Ian Wong