Product Master data not support in SDP94

Former Member
0 Kudos

Hi all

we have one key figure in SDP94 named "safety day's supply" and this key figure is mantaind in product view's Lot Size view.

we maintain this filed for 20day's. but how it's show 5day's in SDP94 screen.

if we chose different Safety Stock Method the day's can change?

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Safety days' supply depends on the Safety stock method. As mentioned in this thread for Standard Safety stock methods like SB, SZ..you have to maintain in Product master whereas for Extended Safety stock methods like MZ and MM, you do not enter the safety days' supply in the location product master, but directly in the planning table for interactive planning. However if you wish to use safety stock methods MZ, MB, or MM, you have to use standard SNP planning area 9ASNP05 and standard planning book 9ASNP_SSP (or a planning area and planning book based on these) that contain the following key figures: 9ASAFETY u2013 Safety Stock (Planned) and 9ASVTTY u2013 Safety Daysu2019 Supply.

Also please check if the safety days supply value maintained in the Interactive planning is coming from Product master or maintained manually. if coming from product master it has to come through a macro SAFETY_DAYS(). SAFETY_DAYS('product' ; 'location' ; 'version' ; safety days' supply ; u2018<name of key figure for safety daysu2019 supply>u2019) returns the safety daysu2019 supply for the location product while taking the parameters defined in the location production master data into account. If these parameters require a manual entry for the safety days' supply enter a value , otherwise enter 0

Former Member
0 Kudos

Hi sai balakavi

Thanks from your information!!

we are setting safety stock method is SM and supply day's is 20day. the master data is never changed.

there have another method to change supply day's in planning screen?

also how can i see the product change history?

our company not active Display change document(/SAPAPO/PROD_CD_READ).

there have another program or tables?

Thanks

Answers (1)

Answers (1)

Former Member
0 Kudos

It depend on safety stock method you use ;with the period-based (dynamic) safety stock methods MZ and MM,you do not enter the safety days' supply in the location product master; instead, you enter it directly in the planning table for interactive planning in the relevant periods.

the safety days supply specifies the number of workdays over

which the system has to take into account future demands when planning

safety stock. For example, if the safety days' supply is three days, the

safety stock has to cover the demands for the next three workdays.

Manish