on 09-28-2008 1:18 PM
Hi all,
While i conform the SD billing the system is displaying the following message...
The Material belong to 3000 plant.
No standard cost estimate could be found for material "11120DAL0"
Message no. K/834
Diagnosis
In Profitability Analysis, an attempt was made while valuating with material costing to read for material "11120DAL0" a standard cost estimate released on posting date "28.09.2008".
The system has discovered that there are no error-free standard cost estimates released in plant "2000" on the specific date "28.09.2008" for material "11120DAL0".
The material cost estimate is accessed according to the CO-PA Customizing settings for costing key "001" under Define Access to Material Costing.
Display Cost Estimate for Material
Display Material Cost Estimate without Quantity Structure
System Response
It is not possible to process the document further.
Procedure
Check your system settings.
Revert
regards
Praveen
Hi,
I understand that the material belongs to Plant 3000. But you might have given in the settings that the costestimate need to be picked up from Plant 2000 (could be a interplant material).
In this case as well, if there is no error free material cost in Plant 2000, this error could come up.
Please check accordingly
Best Regards
Surya
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.