on 09-28-2008 9:38 AM
Hi
I want to make the 57F4 challan in back date. when i try this system accept back date, but when i take the print out of this, then i found that posting is being done on the current date.
Can we make the entry in back date of the 57F4 challan.
Thanks & Regards
Pankaj Garg
Hai pankaj
Why do you want to post on the previous date? If u send a material for subcontracting with in 180 days period u have to bring back to ur plant as per the exise rules . U have so much of
flexibility.
amal sri