can we done back date posting of 57F4

Former Member
0 Kudos

Hi

I want to make the 57F4 challan in back date. when i try this system accept back date, but when i take the print out of this, then i found that posting is being done on the current date.

Can we make the entry in back date of the 57F4 challan.

Thanks & Regards

Pankaj Garg

Accepted Solutions (1)

Accepted Solutions (1)

AmalaSrinivasa
Active Contributor
0 Kudos

Hai pankaj

Why do you want to post on the previous date? If u send a material for subcontracting with in 180 days period u have to bring back to ur plant as per the exise rules . U have so much of

flexibility.

amal sri

Former Member
0 Kudos

hi Amal

actually we have gone Go Live on 10th Sept. and we upload cutover data of 31st aug. we have already made the challan in old ERP from 1st to 9th september, so now we want to make theese old 57F4 in SAP system.

Thanks

Pankaj Garg