on 09-27-2008 4:29 PM
Hi All,
An upgrade to a ECC 6.0 system form 4.6C or 4.7 system is fine. But however, in an integrated environment - the 4.6C system is usually integrated with other SAP Products as well.
The question I have is is a ECC 6.0 system compatible with BW 3.5 or lower versions of BW - i.e. when I upgrade my system to an ECC 6.0 system can these systems still talk in between themselves, or I have to plan a upgrade for this?
If the answer is yes - is it mentioned in any SAP Note/ Website or Document as because I also need an artifact to support the answer.
Thanks, Dibya
Hi Dibya
the component lists (from service.sap.com/scl) document for each release, which product instance is needed for which process (i.e. ECC and NW - BI). This source includes information about old releases as well, but not about mixtures between releases.
In the Upgrade Dependency Analyser will you find information about these mixtures (see for instance: SAP Network Blog: New Tool for Planning Your Upgrade: The Upgrade Dependency Analyzer : )
regards,
Andreas R
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
108 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.