on 09-27-2008 11:32 AM
Hi Team,
Can you tell me the setting for Automatic Rework Order creation by the system when the product is rejected while confirming the production order.
Samar
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi!
Yes you need to assign the trigger point to the last operation so that when you confirm the order with CO15 or Co11n system will trigger the automatic order creation in foreground with quantity same as entered as rework on the confirmation screen.
regards,
uday
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Pls follow the below mentioned procedure:
1. Create a Reference op set in tcode CA11.
Enter the plant, Description, usage and status
for the ref op set
2. Create a Standard trigger point in CO31.(Ex
Production)
Enter the Trigger Point usage /Group as FERT.
3.Tick the Trigger Point Functions.
4. Enable the indicator create order with Reference .
5.Enter the system status as PCNF.
6.The system will says standard trigger point exists from which you can
select the created Trigger Point (EXx Production)and save.
7. MD02/MD04.
8. Convert the Planned Order into Production Order and Release the order.
9 .Now confirm th ops.
10. For the last op enter the yield and rework qty
and set the status as PCNF.
11. If the status of last op is PCNF then in the
system a POP UP will appear as Activited by
Trigger Point /Create order with reference/order
number/sequence and op number which trigger point
works and enter.
12. Now a rework order will be created.
13. In c003 enter the number which is next to the actual prodn order no.Rework order will be seen.
Hope this helps.
Regards,
Tejas
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
HI Tejas,
I followed your said procedure, still I am not getting the result.
I hope the trigger point needs to be assigned to some operation to get it activated. Will u confirm.
Another thing, I have only one operation in my routing. So can I perform CO15 and get the result.
let me know what to select for the status change in Trigger point
there are 3 starus
Set Status
Reset Status
Set and Reset Status
Thanks samar
User | Count |
---|---|
98 | |
11 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.