Hi Team,

Can you tell me the setting for Automatic Rework Order creation by the system when the product is rejected while confirming the production order.

Samar

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi,

Its possible.

Please refer detailed response from Mr.Nandakumar in the thread below.

You can follow the steps and try to replicate it.

[Thread|;

Hope this helps.

Regards,

Ashok

Answers (2)

Answers (2)

Former Member
0 Kudos

Hi!

Yes you need to assign the trigger point to the last operation so that when you confirm the order with CO15 or Co11n system will trigger the automatic order creation in foreground with quantity same as entered as rework on the confirmation screen.

regards,

uday

Former Member
0 Kudos

Hi,

Pls follow the below mentioned procedure:

1. Create a Reference op set in tcode CA11.

Enter the plant, Description, usage and status

for the ref op set

2. Create a Standard trigger point in CO31.(Ex

Production)

Enter the Trigger Point usage /Group as FERT.

3.Tick the Trigger Point Functions.

4. Enable the indicator create order with Reference .

5.Enter the system status as PCNF.

6.The system will says standard trigger point exists from which you can

select the created Trigger Point (EXx Production)and save.

7. MD02/MD04.

8. Convert the Planned Order into Production Order and Release the order.

9 .Now confirm th ops.

10. For the last op enter the yield and rework qty

and set the status as PCNF.

11. If the status of last op is PCNF then in the

system a POP UP will appear as Activited by

Trigger Point /Create order with reference/order

number/sequence and op number which trigger point

works and enter.

12. Now a rework order will be created.

13. In c003 enter the number which is next to the actual prodn order no.Rework order will be seen.

Hope this helps.

Regards,

Tejas

Former Member
0 Kudos

HI Tejas,

I followed your said procedure, still I am not getting the result.

I hope the trigger point needs to be assigned to some operation to get it activated. Will u confirm.

Another thing, I have only one operation in my routing. So can I perform CO15 and get the result.

let me know what to select for the status change in Trigger point

there are 3 starus

Set Status

Reset Status

Set and Reset Status

Thanks samar

Former Member
0 Kudos

Hi,

You can use status +(status set).

And assign the trigger point to your single operation. While confirming through CO15 , select partial confirmation radio button and enter the produced as well as rework quantity.

Pragash