cancel
Showing results for 
Search instead for 
Did you mean: 

Reservation

Former Member
0 Kudos

Hi

Could anybody explain me the resevation process? or able to send me the ref links.....

Thanks in advance..

Anjali

Accepted Solutions (0)

Answers (4)

Answers (4)

former_member192897
Active Contributor
0 Kudos
Former Member
0 Kudos

hi

With this component, you make a request to the warehouse to keep materials ready for withdrawal at a later date and for a certain purpose. This simplifies and accelerates the goods receipt process.

A reservation for goods issue can be requested by various departments for various account assignment objects (such as cost center, order, asset, etc.).

Features

The purpose of a reservation is to ensure that a material will be available when it is needed. It also serves to simplify and accelerate the goods issue process and prepare the tasks at the point of goods issue.

It is also important that reservations are taken into account by Material Requirements Planning (MRP), which means that required materials are procured in time if they are out of stock.

Planning a Goods Issue

You can handle both planned goods issues and unplanned goods issues.

Manual and Automatic Reservations

The R/3 System supports manual and automatic reservations. Manual reservations are entered directly by the user. Automatic reservations are generated automatically by the R/3 System. There are two types of automatic reservations:

Reservations for orders, networks, WBS elements:

When an order, a network, or a project is created, the components from the warehouse are reserved automatically.

Stock transfer reservations:

If reorder point planning is used at storage location level and the available stock on hand falls below the reorder point, the system generates a stock transfer reservation in the plant for the replenishment quantity.

You can refer this link for detailed information on creating, changing, displaying and managing reservations

http://help.sap.com/saphelp_47x200/helpdata/en/a5/63373a43a211d189410000e829fbbd/frameset.htm

thanks

jai

Former Member
0 Kudos

Dear,

As names say everything - Reservations in SAP ERP used for reserve inventory material for a specific purpose on a specific date. In other words control the stores issue of reserved material for safe and secure process of scheduled maintenance, repair etc.

The Transactions used in Reservations are:

MB21 - Create Reservation

MB22 - Change Reservation

MB23 - Display Reservation

MB24 - Reservations by Material

MB25 - Reservations by Account Assignment

For step by step guide on how to create a simple Reservation, please find on below link with Screenshots. Hope this will give you an idea about reservations.

http://sapbrainsonline.com/PROJECTS/FUNCTIONAL/create%20a%20reservation%20using%20transaction%20MB21...

Regards,

Syed Hussain.

Former Member
0 Kudos

Dear,

Reservation is create with MB21.

After creation of reservation store people issue the material against reservation with MIGO against Good issue.

You can change reservation with MB23 and display with MB23.

With MB26 you can see the list of reservation

Process: -When you want some stock to reserve for your production in advance at that time you have to create reservation and reserve your stock.

Then Store person issue material for your reservation with MIGO >> Good issue >> Reservation.

Also refer below links.

[http://sapbrainsonline.com/PROJECTS/FUNCTIONAL/create%20a%20reservation%20using%20transaction%20MB21.html]

Regards,

Mahesh Wagh