EU_reorg job is Continuously runing in UPD process

Former Member
0 Kudos

Hi All,

EU_reorg job is Continuously runing in UPD process, due to that we are not able to save data in system, can any one help me on the same.

Thanks

DDM

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

Hi,

Do the following.

1. Delete the lock from SM12.

2. Kill the process in SM50 ("cancel without core").

3. Cancel the BTC job in SM37 (if needed kill the BGD process in SM50 as well).

This job is actually not running just a zombie. If needed clean up the zombies as well from SM61.

Thanks, Dibya

Former Member
0 Kudos

Hello

As per Snote 327321 Support Packages and Patches ABAP Workbench needs two batch jobs, which should be processed every day re organization of its tables. So probe a bit deeper into the problem and if possible provide some more data on this for further checking.

Like the periodicity of the scheduled job etc, user by whome scheduled, current patch level, steps where the job is struck .etc

Regards

Former Member
0 Kudos

Hi Manas,

After restarting the server and database, system show me the old lock entry.

could please help me how over come from this problem

Table name :- lock entry tables name MBEW

lock argument:- 100ÐÏ À¡± Á##########0001@@@@@@@@@@

Lock Mode : E

Server has been restart still this entry is not cleared

Thanks