Dear Gurus,

We have the following scenario here.

we are using location substitution for rule based availability check. there is a location "A" whose sales orders are to be fulfilled with any of the 3 locations "B", "C" or "D".

Suppose there is a requirement of 5000 units at A then it will search at B, then in C and then on D.

if material is available at D then it will pick up from D after checking availability in B and C ( We are using fan shaped structure).

if there is material quantity of 3000 available in C and 10000 in D , then system will pick 3000 from C then will go to D to pick rest of the 2000 quantity.

i want system to pick from a location from where it could get all the 5000 quantity.

for example in our case it should pick all 5000 from D rather than 3000 from C and 2000 from D.

what setting can be done to get this kind of result? Kindly advice.

Thanks in advance.

Regards,

Nitesh

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi Nitesh,

In calculation rule under ATP Calculation profile, enter maximum number of partial deliveries is 0.

-Deepak

Answers (1)

Answers (1)

Former Member
0 Kudos

This requirement can be maintained in Check Instruction in APO Customization. Please go to SPRO>APO>GATP>General Settings>Maintain Check Instructions...select the column "Remaining Requirements" and select first option"Do not create Remaining Requirement"