In Process/Operational SubContracting

Dear All,

I want the suggestion abt the subcontracting scenario which wr r trying for our client.

The scenario is of Inprocess/Operational Subcontracting.

Steps are as follows:

We are creating a production order for sub assembly A

In that order we are having 5 operations. Out of those 2nd & 4th operation are at subcontractor.

1. Confirmation of 1st operation.(CO11N)

2. Creation 2 material masters for subcontracting.(B,C)

3. From CO11N doing the goods movements of C from the production order-Operation 1.with movement type 531.

4. 2nd operation with PP02 control key,for subcontracting PR.

5. Creation of subcontracting PO for B with the component C.

6. Transfer of C to vendor from stock with movement type 541.

7. GR of PO for B,it will directly consumed to the production order.

Same steps we r doing for next subcontracting operations.

So, Now I want some suggestions/clarification on these steps.

Also tell me the costing effects on the production order.

Your valuable answers will help me a lot.

Thanks,

Sachin Patil.