I m doing MIGO though Subcontracting and my all materials are BOM material now i have to add one more material which is without BOM.

So can i add that if yes than how??

Regards,

Vishal

Accepted Solutions (1)

Accepted Solutions (1)

deiva
Active Contributor
0 Kudos

Hai,

That's not possible at MIGO level.

You can do this by

1.Amend the PO by ME22N & enter the material in the components tab - PO item level - Material dta.

2.Do the transfer posting with 541 mvt type.

3.Now do the GR for SC po.

Answers (5)

Answers (5)

Former Member
0 Kudos

thanks

Former Member
0 Kudos

Dear

we have Add another alternate BOM but while doing MIGO its calling ony Existing BOM not alternate BOM, so how this Alternate BOM will call.

Please explain.

Thanks,

Vishal

Edited by: vishal garg on Sep 25, 2008 7:20 AM

Former Member
0 Kudos

please solve my issue.

csaba_szommer
Active Contributor
0 Kudos

Hi,

You can create a production version for the alternative BOM and assign this production version to the subcontracting info record.

Csaba

Former Member
0 Kudos

Hi,

You can change it in ME22n as you are yet to do the GRN...

Reg,

Deepak.

Former Member
0 Kudos

Hi,

You can do GR for that material provided that material is included in Purchase order.

is that additioanl material is procured from the same vendor please confirm.

Regards

Ravi shankar.

csaba_szommer
Active Contributor
0 Kudos

Hi,

Are you speaking about a component of the F-30 material?

If yes, please go to ME22N, open the related PO, go to the material tab of the related item and modify the component list.

After that you should send the goods to your sc-vendor by MB1B + 541 (to be able to consume it when doing GR in MIGO).

Regards,

Csaba

If you need this component in the BOM later (in the long run), use CS02 to modify the BOM.

Edited by: Csaba Szommer on Sep 24, 2008 1:28 PM