MRP Controller in Netwrok Header

Hi,

Can we deactive MRP controller as a mandatory input while creating network ?

What exactly does MRP controller contribute for ? If don't assign or if I assign wrong do I loose somewhere ?

How it is different from the one in material master of the material assigned to network activity?

Thanks

Saikishore Ganga.