on 09-24-2008 10:56 AM
Hi,
what are the config steps for make to order scenario in SD. how availibility check and TOR is done in make to order. any special config settings for TOR and availibility for make to order
regards
sachin
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
MAKE TO ORDER PRODUCTION (PROCESS FLOW)
First Create a material with MM
Basic data1:
Give Material name : Cycle
Material group : 010
Division : MA
Net Weight : 10 Kg's
Gross Weight : 10Kgs.
Sales: Sales org.1 :
Base Unit of Measure : EA
Delivering Plant : RAMA
Output Tax : 1 ( Full tax)
Sales: General/Plant :
Availability Check : 01 ( Daily Requirements)
Trans.,group : 001
Loading Group : 0003
MRP 1:
MRP Group : 020 ( Make to Order Production)
MRP type : PD (MRP)
MRP controller : 000
Lot size : EX ( Lot-for-Lot order quantity)
MRP 2:
In-house Production : 1
Schedule Margin Key : 000
Forecasting:
Forecast Model : D (Constant Model)
Accounting 1:
Price control : V ( Variable Price)
Variable Price : 4000
Price Unit : 1
Then enter & Save.
Material 769 created.
Create a Sales order with VA;
Order type : OR
Sales Organization : RAMA
Distribution Channel : RA
Division : MA
Sales Office : RAMA
Sales Group : RAM, .............. Enter
Sold to Party: 6000000000
PO number : 55 , PO Date : 04.06.2007.
Item Overview Tab:
Material 769, Quantity : 100
Enter & Save the Document.
Sales Order 8212 Created
Create Production Order with CO:
Enter Sales order number: 8212, Item No. 10
Order type: PP, Enter
Click on FLAG,
Select Generate Operation and enter NO,
save the Document.
Production Order Created: 60002725
Confirm the Production Order with CO15.
Enter Production Order No. 600075 and save the Document.
Now the confirmation Order will be saved.
Create Goods Receipts with MB31.
Movement type: 101
Order: 6002725
Plant: RAMA
Storage Location: RAMA
Enter and Save, you will get Document Posted: 50000068931posted.
Check the Stock Position with MMBE
Material: 769
Plant: RAMA
Storage Location: RAMA
Execute (F8), here we can see the stock at Sales Order Stock.
Create Delivery with VL01N, Billing with VF01 and Post to Accounts.
Process Flow
1. Planning a Product
T.code: MD61
Planned Independent Logistics Production Production Planning Demand ManagementRequirements Create
2. Creating a Sales Order
T.code: VA01
Sales Order Create Logistics Sales and Distribution
3. Executing Multi-Level Requirements Planning
T.code: MD02
From the MRP node, chooseSingle Item - Multi-Level Planning
4. Converting the Planned Order into a Production Order
Tcode: MD04
From the MRP node, choose
EvaluationsStock/Reqmts list
5. Withdrawing the Material for the Production Order
T.code: MB1A
Issue Logistics GoodsMaterials Management Inventory Management Goods Movement
6. Confirming the Production Order
T.code: CO11N
For Operation Logistics Time Ticket Production Production Control Confirmation Enter
7. Creating a Delivery
T.code: VL01N
Shipping and Transportation Single Document Reference to Sales OrderLogistics Sales and Distribution With Outbound Delivery Create
8. Creating a Billing Document
T.code: VF01
Logistics Create Sales Billing Billing document
Thanks
Bhushan
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear Sachin
If u check across the sdn and related links u will get more details.
For configuring the TOR:
1) Use std 041 reqts class or copy and rename it. Use the indicators to select if this reqts class must carry out an availability check and/or a TOR.
2) Define the reqts types. A reqts type is allocated to a single reqts class and not vice versa. It is based on the item category and the MRP type of the material.
3) Assign the rqts type to the relevant item category in the sales order and the MRP type found on the material master record.
You can select an alternative search strategy where u assign the reqts type to item category and MRP type. Can select source as 0, 1 or 2. (1 = Item type and MRP type strategy).
4) The TOR and Availability check can be selected/de-selected at the schedule line category level.
5) Block qty confirmation in delivery blocks. This is used to block the reservation of the TOR from MRP.
6) Maintain requirements for TOR. Requirements can be used to determine that the TOR to MRP is not carried out unless a number of conditions are met.
Availability Overview = CO09 à order qty, sd doc no, item no, requirements class.
Stock requirements list = MD04 à sd no or dly no, line item, schedule line placing the demand
Stock overview = MMBE à total stock per company, then plant followed by storage location, and finally a breakdown per batch.
Hope this helps u.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi there,
Pls refer http://help.sap.com/erp2005_ehp_03/helpdata/EN/70/a7853478616434e10000009b38f83b/frameset.htm
for MTO scenarios.
Regards,
Sivanand
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
The Make-to-Order with Component Availability Check scenario is tailored to fulfill the specific production requirements of manufacturers of configurable products. The key feature of this scenario is that a component availability check is triggered for a requested product as soon as the sales order is entered into the system. Missing components are identified immediately and the earliest possible delivery date of the configurable product is determined.
The scenario is particularly suitable for configurable products such as personal computers, engines or other products from the high tech and machinery industries.
for details about config
Please check this documentation:
http://help.sap.com/saphelp_erp60_sp/helpdata/en/70/a7853478616434e10000009b38f83b/frameset.htm
Thanks,
raja
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
108 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.