Planned Order conversion to Production Order

Former Member
0 Kudos

Hi,

I am converting the Planned Order to Production Order. All the components needed are assigned to Storage Location 0002. Where as while converting system is giving the error that the Storage Location 0001 could not be adopted for the components.

Where is the configuration setting so that it should adopt the correct storage location?

Regards

Ramakanth

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Where u have assigned the location? It should be in WS view of Mat master, field is Prod stor loc. At the same time the material has to be extended to that location also.

Pls check and let us know.

Edited by: BNR on Sep 24, 2008 7:54 AM

Answers (1)

Answers (1)

former_member335796
Active Contributor
0 Kudos

Hi,

If you maintain the Storage location in BOM Component details, then system will consider this first than Material Master.

Check this also..

Regards,

Siva